Top dressing in the sand and crumb rubber
-
-
Installing the lines and logo
-
Turf installation going well despite the cold weather
-
Rolling out the synthetic turf
-
Ready for the turf
-
Stone work almost complete
-
Continuing with the fabric
-
Drain lines and stone going in
-
Infiltration pit 2 almost complete
-
Perimeter curbing finished
-
Perimeter curb installation
-
Top of curbing